Case Study: Shopping Centre

Contract No:02/811/7007

Client:Undisclosed

Location:Manchester

Value:TBA

Summary: Job Completed


Background

A National Flue Lining Contractor had been awarded a project to install 1 x 96m x 425mm and 3 x 96metre x 475mm diameter Furanflex thermo-setting resin liners into a Shopping Centre in Manchester to serve new boilers in the plant room. The first had been successfully installed.

The second flue had collapsed in the flue on commencement of stream curing. The liner had then fallen to the base of the flue. By the time the contractor had gained access to the flue via core drilling into the chimney, the liner had compacted and cured in around 8.5m of flue. This was critical; what was previously a usable flue had become blocked, which had serious implications for the Shopping Centre’s ability to heat the building.


The Challenges

The contractor had spent a week core drilling and attempting to gain access to the liner to remove it. This failed, as once access had been gained, it was discovered that the tools available to the contractor, both for hire and in-house, were not able to cut the liner. The liner is constructed of a resin, glass fibres, plastic and Kevlar mix, which presented a singular challenge to cut with conventional tools.


The Solution

Buxton Water were called to site. It quickly became apparent that conventional water jetting equipment would not be appropriate.

Using our expertise and experience, Buxton Water were able to manufacture the appropriate equipment to allow the removal of the 450mm diameter liner 8.5m vertically through a 1m opening in a single elevation of the chimney wall.

High-pressure rotating nozzles were used to emulsify the liner before the used water could be filtered and allowed to drain away.


The Outcome

Buxton Water were able to deliver a solution quickly to a previously insurmountable problem.

Once again, this demonstrates our ability to adapt to a project that poses an unusual requirement; Buxton Water will work with our client to establish a practical, safe, environmentally sound and cost-effective solution.


 
 
 

Comments


Contact us

Unit 1a Maple Court Maple View, White Moss Business Park, Skelmersdale, WN8 9TW

Business hours

Monday – Friday: 07:00 - 17:00

Saturday – Sunday: 08:00 - 16:00
 

24/7 Emergency Call Out Available

Connect with us

  • LinkedIn
  • Google Business Profile
Find us on Yell logo

BUXTON WATER LTD, registered as a limited company in England and Wales under company number: 04023517.
Registered Company Address: Whitehead & Howarth 327 Clifton Drive South Lytham St. Annes, England, FY8 1HN.

Terms of Use | Privacy & Cookie Policy | Trading Terms

© 2026. The content on this website is owned by us and our licensors. Do not copy any content (including images) without our consent.

bottom of page