Buxton Water Hydrodemolition, Drainage and Minor Civils

Robotic Hydrodemolition

Robotic Hydrodemolition

We are proud to operate one of the largest UK based robotic hydrodemolition fleets, offering the perfect solution to those looking for a safe and efficient solution for the removal of concrete.

Robotic hydrodemolition opens up the opportunity for significantly increased rates of concrete removal compared to manual hand lance hydrodemolition methods, with an average 5 times greater productivity alongside the benefit of a safer working environment.

What Is Robotic Hydrodemolition?

Robotic hydrodemolition involves using high pressure water jets with robots which are able to withstand extreme forces, allowing for the use of larger pumps at a greater pressure than manual lance hydrodemolition.

This is the standard solution offered when the requirement is for the removal of greater than 5m3 of concrete and when a quicker solution is required and when no access or water supply restrictions are present.

Robotic Hydrodemolition Contractor
Robotic Hydrodemolition Services

Why Use Robotic Hydrodemolition?

Robot hydrodemolition is the perfect solution for the removal of concrete and offers the following benefits:

  • Suitable For Larger Areas Of Concrete Removal
    When the area of concrete to be removed is greater than 5m3, robotic hydrodemolition offers the quickest, most efficient and cost effective solution.
  • Consistency
    The use of robotics allows for consistency across removal, ensuring an even depth across all cuts across a project; something which is difficult to achieve to the same level of precision with manual lance hydrodemolition.
  • Increased Speed Of Removal
    The use of robotics allows for much faster concrete removal than manual lance hydrodemolition, allowing for faster completion of projects alongside increased cost efficiency and assistance of project planning.
  • A Safer Way Of Working
    The use of robotics is, as expected, a safer way of working as there is no manual strain placed upon the operator. The method creates no dust and noise is minimal.
  • Environmentally Friendly & No Damage To Surrounding Surfaces
    The approach offers no damage to the surrounding surfaces, resulting in an environmentally friendly method compared to alternatives, making it also perfect for use on sensitive structures.

Our Robotic Hydrodemolition Equipment

Buxton Water are proud to operate one of the UK’s largest fleets of state of the art robotic hydrodemolition equipment, offering the perfect solution for the removal of concrete with high pressure water jets on projects of all sizes.

If you would like to discuss the equipment which we use and any restrictions on a specific project, we welcome you to get in touch on 01942 290130.

Robotic Hydrodemolition Testimonials

Please see below a number of testimonials from a number of recent robotic hydrodemolition projects:

Chris Coleman – Site Agent for AE Yates Limited commented; “Thanks to everyone at Buxton Water for your hard work and efforts over the last few months to get us to this point, although this hasn’t always been the easiest of jobs due to the logistics and its tight nature I am pleased with your performance on site, the lads attitude has been great, I feel when there has been issues we’ve come together well to rectify these.”

Water Jetting Association
Water Jetting Association
Water Jetting Association
Water Jetting Association
Water Jetting Association
Safe Contractor
UVDB Achilles
LATEST COMPANY NEWS
24 Hour Call Out

December 7th, 2016

24 Hour Call Out

Buxton Water expands its Reactive Maintenance Services across the country, delivering our market leading 24 hour call out service.

Read More »

October 26th, 2016

NEW Buxton Water Head Office

As part of our ongoing expansion the Company has invested £300k in new office premises at Maple Court, adjacent to junction 4 of the M58 at Skelmersdale in Lancashire. After months of planning the move was completed in October with […]

Read More »

OUR LATEST PROJECTS

December 4th, 2018

Case Study: Shopping Centre

Contract No: 02/811/7007 Client: Undisclosed Location: Manchester Value: TBA Summary: Job Completed Background A National Flue Lining Contractor had been awarded a project to install 1 x 96m x 425mm and 3 x 96metre x 475mm diameter Furanflex thermo-setting resin […]

Read More »

October 23rd, 2018

Case Study: The Greyhound Bridge

Contract No: 02/501/6877 Client: AE Yates Location: Lancaster Value: TBC Summary: 245m³ of Concrete Removed Background Greyhound Bridge carries the A683 (Greyhound Bridge Road) over the River Lune. It was constructed in 1911 as a railway viaduct and converted to […]

Read More »